Trade Directory/Spec № 01
Kitchen RemodelingCover plate · Kitchen Remodeling

Spec Sheet № 01 · Issued 2026

Kitchen Remodeling

From layout reworks to chef-grade gut remodels, we design kitchens that work as hard as you do.

Pricing
Lump-sum, itemized
Crew
In-house staff
Service area
Beltway 8 + 25mi
Warranty
Workmanship-backed

Section A

Scope of Work

Everything written into the contract before the first nail. Lines are itemized, not bundled.

  • / 01Custom cabinetry and quartz / quartzite islands
  • / 02Lighting plans with under-cabinet and pendants
  • / 03Appliance integration and panel-ready finishes
  • / 04Flooring, backsplash, and plumbing handled in-house

Section B

Build Tracks

Three lanes most kitchen remodeling jobs fall into. Pick a lane on the walk-through; the budget follows.

01Track A

Cosmetic refresh

New paint, hardware, lighting, and backsplash on existing layout — fast, high-impact, lower budget.

02Track B

Pull-and-replace

Same footprint, brand-new cabinets, counters, and appliances. The sweet spot for most Houston homes.

03Track C

Layout reconfiguration

Move walls, relocate plumbing, open to the living area, add an island. Full design and engineering included.

04Track D

Chef-grade gut remodel

Down to the studs. Pro appliances, custom millwork, integrated lighting, and stone-slab finishes.

Section C

Materials & Method

Kitchen Remodeling material detail 1Kitchen Remodeling material detail 2

Cabinets set the tone — solid-wood shaker or flat-panel painted boxes hold up far better than thermofoil or MDF. Quartz resists stains and never needs sealing; quartzite and marble bring natural movement but want yearly care. We pair them with full-height tile or slab backsplashes, plywood-box construction with soft-close hardware, and 20-mil luxury vinyl, engineered hardwood, or large-format porcelain underfoot.

Section D

House Standards

/ 01

In-house cabinet, tile, plumbing, and electrical crews — no sub-of-a-sub markups

/ 02

Design selections handled with you, not handed off to a third-party showroom

/ 03

Realistic timelines: most pull-and-replace kitchens finish in 5–8 weeks

/ 04

Workmanship warranty on every install we touch

Section E

From the Job Book

Open full job book
Kitchen Remodeling project 1
Plate 01
Kitchen Remodeling project 2
Plate 02
Kitchen Remodeling project 3
Plate 03

Open a File

Bring Us Your
Floor Plan.

Walk-throughs are on the house. We hand back measured drawings, a locked-in budget and a calendar before a single demo bag opens.